Approach
An engagement built around operations.
Aïsto documents existing behaviour, interfaces, and operating conditions before modifying configuration. Changes are prepared outside production where possible, then verified against a test plan and rollback strategy.
Typical deliverables
- Configuration and dependency record
- Controlled design or configuration
- Test and acceptance procedure
- Change record and backups








