Commissioning and modernization

Validate applications and maintain controller reliability.

Approach

An engagement built around operations.

Aïsto documents existing behaviour, interfaces, and operating conditions before modifying configuration. Changes are prepared outside production where possible, then verified against a test plan and rollback strategy.

Typical deliverables

  • Configuration and dependency record
  • Controlled design or configuration
  • Test and acceptance procedure
  • Change record and backups