Industrial Automation

Migration to Experion PKS

Transfer legacy process control to a modern platform.

Approach

An engagement built around operations.

Aïsto documents existing behaviour, interfaces, and operating conditions before modifying configuration. Changes are prepared outside production where possible, then verified against a test plan and rollback strategy.

Typical deliverables

  • Configuration and dependency record
  • Controlled design or configuration
  • Test and acceptance procedure
  • Change record and backups